Public service · Worked example

Set terms for a data-center project

Compare a broad growth promise with explicit power-cost and community-review terms.

Versions
2
Generated per version
120
Audience segments
6

Kite · lab guide

Start with the decision. Read both versions, then see which assumptions move the model.

This fictional study uses generated cases and authored audience weights. It contains 0 human responses.

The decision brief

Which project terms should a utility and local authority take into public consultation?

Decision owner
Public affairs lead, utility and local authority
Objective
Identify which cost-allocation and accountability questions consultation must resolve.
Hypothesis
Explicit cost allocation and independent review may change reactions to a project framed around growth.

Decision rule

Use modeled reactions to prepare consultation. A project decision requires verified utility, water, environmental and contractual evidence and the public process applicable to the project.

Two versions of the scenario

Both versions use Host-region households and power customers and seed 19427.

Baseline

The local authority proposes a large data center and a new power connection. The project promises jobs and business investment. The utility may recover grid upgrade costs through household electricity prices. The authority will approve the agreement before publishing the detailed tariff and water-use estimates.

Modeled acceptance
47/ 100
Modeled risk
38/ 100

Across 6 scored audience segments, acceptance ranged from 39 to 57 on the 100-point scale.

How assumptions affect the scores

Each row uses the same wording under a different set of conditions. Read the differences within this table as a sensitivity check.

Recorded assumption checks on a 0 to 100 scale
ConditionAcceptanceRisk
Declared conditions4738
Assume an economic recession4047
Assume a hostile media environment4738
Assume a political crisis4540
Explore 6 segment reactions
  • Rust Belt Protectionists

    Acceptance 39 · Backlash 61

    Rust Belt Protectionists is on the fence (40%). Concerns about overly abstract language could push this tribe either way.

  • Rural Independence Movement

    Acceptance 42 · Backlash 58

    Rural Independence Movement is on the fence (42%). Concerns about overly abstract language could push this tribe either way.

  • Eco-Radical Activists

    Acceptance 44 · Backlash 57

    Eco-Radical Activists is on the fence (44%). Concerns about overly abstract language could push this tribe either way.

  • Institutional Trusters

    Acceptance 46 · Backlash 54

    Institutional Trusters is on the fence (46%). Concerns about overly abstract language could push this tribe either way.

  • Eco-Pragmatist Bipartisans

    Acceptance 49 · Backlash 51

    Eco-Pragmatist Bipartisans is on the fence (48%). Concerns about overly abstract language could push this tribe either way.

  • Pro-Business Centrists

    Acceptance 57 · Backlash 43

    Pro-Business Centrists is on the fence (56%). Concerns about overly abstract language could push this tribe either way.

Developer-funded connection and public review

The local authority proposes a large data center subject to a public review before approval. The developer will fund its grid upgrade costs under a published utility tariff. Publish water-use estimates, jobs commitments, household price effects and independent monitoring reports. A community panel may review complaints and recommend changes during the first year.

Modeled acceptance
41/ 100
Modeled risk
49/ 100

Across 6 scored audience segments, acceptance ranged from 27 to 47 on the 100-point scale.

How assumptions affect the scores

Each row uses the same wording under a different set of conditions. Read the differences within this table as a sensitivity check.

Recorded assumption checks on a 0 to 100 scale
ConditionAcceptanceRisk
Declared conditions4149
Assume an economic recession3454
Assume a hostile media environment4149
Assume a political crisis4049
Explore 6 segment reactions
  • Rural Independence Movement

    Acceptance 27 · Backlash 73

    Rural Independence Movement is resistant (28%). This scenario conflicts with Federal government is the problem and risks activating the "overly abstract language" framing trap.

  • Pro-Business Centrists

    Acceptance 39 · Backlash 61

    Pro-Business Centrists is resistant (39%). This scenario conflicts with Business creates prosperity and risks activating the "overly abstract language" framing trap.

  • Rust Belt Protectionists

    Acceptance 39 · Backlash 61

    Rust Belt Protectionists is on the fence (40%). Concerns about overly abstract language could push this tribe either way.

  • Eco-Pragmatist Bipartisans

    Acceptance 46 · Backlash 54

    Eco-Pragmatist Bipartisans is on the fence (47%). Concerns about overly abstract language could push this tribe either way.

  • Institutional Trusters

    Acceptance 47 · Backlash 53

    Institutional Trusters is on the fence (47%). Concerns about overly abstract language could push this tribe either way.

  • Eco-Radical Activists

    Acceptance 47 · Backlash 54

    Eco-Radical Activists is on the fence (46%). Concerns about overly abstract language could push this tribe either way.